The Instrument Landing System (ILS) of Corisco International Airport, Equatorial Guinea, needs 200W per 24 hours / 4.8kWh per day and three days autonomy.

JUA Solution:

  • 1 mppt charge controller 48V 80A (150Vdc on mppt);
  • 1 Hybrid inverter 2.4kVA;
  • 20kWh OPZV battery pack;
  • 5.7kWp PV power (20 modules 285Wp in 2 string of 10 modules);
  • 1 Diesel Generator 4kVA for back-up.